What methods of pouring floor can be used
Sometimes the mixtures are poured in two stages. There are two types of mixtures for this. The first layer will be the mixture for the initial leveling. But such mixtures are not smooth. And in order to make the floor smooth pour a layer of the finish mixture. The finish mixture is applied with a layer of a thickness of a few millimeters. Such a mixture forms a very even and smooth coating.
The option is still not so troublesome and dirty, t. e. Without the use of the mixture. To do this, you can use the sheets of the CSP – cement -stoves.
Paul preparation is the same. We draw a line of alignment and lay the base for the floor.