How does the installation of a multi -level ceiling from drywall begins
First of all, it is necessary to mark the places where the profiles of the UD and suspension will be installed. It is necessary to measure the entire room in all corners. To do this, choose a wall with the least height, then reduce this value by five centimeters. Then, using a water level and pencil, draw horizontal lines on the marked height on the surface of the walls. Then on the ceiling you need to draw straight lines with a step of seventy centimeters.
The next step will be the installation of profiles of ud and suspensions. To do this, attach each profile alternately to the wall along the drawn lines and drill holes. The suspensions must be applied to the lines on the ceiling, while marking the positions of the holes with a pencil, then drill holes in the intended places. Plastic dowels must be scored into these holes, and then attach profiles or suspensions and fix them with self -tapping screws.