Stage Plan for erecting a ceiling made of drywall
Work begins with the marking of the location of our suspended ceiling, t. e. Determine the location of the zero tier. This stage of work must be treated and executed with special accuracy, t. To. The final quality and type of each ceiling largely depends on it.
Next, proceed to the installation of the frame. It is necessary to take into account the technical pounds of fastening the ceiling: the suspension system should be calculated based on the further load data – at least 15 kilograms for any square meter. It is necessary to install the frame tightly, excluding the slightest fluctuations. Earlier than everyone, make the marking of the fastening points of our design. At points of marking using a perforator, holes with a diameter of 6mm and a depth of about 50 mm are drilled if the walls are brick or concrete.